9.39 Where manual operation (e.g. aseptic compounding or filling) occurs, each type of container,container closure and equipment train should be initially validated with each operator participating inat least 3 consecutive successful APS and revalidated with one APS approximately every 6 months foreach operator. The APS batch size should mimic that used in the routine aseptic manufacturingprocess.