The results of the assessment were developed into a top-line straw model that was discussed with senior management and the major stakeholders. The straw model was then refined and utilized to identify the appropriate stakeholders to engage in the process redesign. This was risky since they had already been through two redesigns; the difference this time was it was done completely internally with key stakeholders assembled into a project team