c. If the machine hour method is used in applying factory overhead
and the predetermined rate is $12.50 an hour, what
amount should be charged to 2010 for factory overhead?
Assume that the direct materials used totaled $5,000, the
direct labor cost totaled $3,200, the direct labor hours were
250 hours, and the machine hours were 295 hours.