"(2) Operations are in accordance with the mechanism to follow the lot, such as raw materials, member lot, incoming inspection, manufacturing process input, shipping inspection, shipping location, etc.
Manufacturing period, place, and quantity can be specified when a nonconformity occurs.
→ Check whether lots are traceable using an actual finished item as a sample."