6.0 PROJECT ORGANIZATION
The project is organized as indicated on the Project Organization Chart and/or assignment list, which will be maintained by the Project Manager.
All staffs and resources in the organization responsible for managing and reviewing HSE strategies,
policies and performances.
7.0 ENGINEERING DESIGN
7.1 GENERAL
PROFESSIONAL ALUCLAD CO., LTD. will incorporate HSE requirements into ourr work processes. Each Staff discipline is responsible to adhere to the requirements and to plan discipline related activities in further detail, should this be required.
7.2 DESIGN HSE PRINCIPLES
This project will be engineered with HSE as a prime consideration. The safety of all personnel shall be considered at all stages of the design, and engineering action shall be taken to ensure the safety of all personnel during construction, commissioning, operation of the site. The project shall also be engineered to minimize any damage or loss both to properties and environment.
8.0 RESPONSIBILITIES AND TASKS