RESIDENCE METROPOLE SERVICE APARTMENT (Unit Baht)
FENIX THONGLOR Projetion Actual Suplliers Payment Balance
1 Structural Works 10,700,000 8,764,991 5,101,197 3,663,794
- Demolation Works 3,531,000 Fenacon Co., Ltd. 3,531,000 -
- Structural Works 5,233,991 Fenacon Co., Ltd. 1,570,197 3,663,794
2 Architectural Works 10,700,000 18,190,000 3,638,000 14,552,000
- Architectual Works 18,190,000 Fenacon Co., Ltd. 3,638,000 14,552,000
3 Interior Decoration Works 48,150,000 48,150,000
4 M&E works 69,550,000 55,640,000 11,128,000 44,512,000
- Material Cost 42,800,000 Ficoplus Co., Ltd. 8,560,000 34,240,000
- Labour Cost 12,840,000 Fenacon Co., Ltd. 2,568,000 10,272,000
5 External Façade & Soft Works 32,100,000 32,100,000
6 Operating, Consultant & Design Fee 10,700,000 7,466,384 3,098,109 4,368,275
- Interior Design Fee 1,926,000 Leo International Design Group 963,000 963,000
- Architectural Design Fee 2,140,000 Interkon Akitek Co., Ltd. 856,000 1,284,000
- Lighting Design Consultant Service 214,000 C&P Lighting Co., Ltd. 42,800 171,200
- Soil Investigation 50,000 Mr. Jongsawadi Maneesinth 50,000 -
- Soil Investigation 557,684 STS Engineering Consultant Ltd. 557,684 -
- Slab Load Test 224,700 Finese Soil Testing Co., Ltd. 224,700 -
- Project Consultant 2,354,000 Northcorft Consultant Ltd. 403,925 1,950,075
7 Operating Supplies & Equipment 26,750,000 26,750,000
8 Preopening Expenses 5,350,000 5,350,000
Total Construction Cost 214,000,000 202,411,375 22,965,306 67,096,069
RESIDENCE METROPOLE SERVICE APARTMENT (Unit Baht) FENIX THONGLOR Projetion Actual Suplliers Payment Balance 1 Structural Works 10,700,000 8,764,991 5,101,197 3,663,794 - Demolation Works 3,531,000 Fenacon Co., Ltd. 3,531,000 - - Structural Works 5,233,991 Fenacon Co., Ltd. 1,570,197 3,663,794 2 Architectural Works 10,700,000 18,190,000 3,638,000 14,552,000 - Architectual Works 18,190,000 Fenacon Co., Ltd. 3,638,000 14,552,000 3 Interior Decoration Works 48,150,000 48,150,000 4 M&E works 69,550,000 55,640,000 11,128,000 44,512,000 - Material Cost 42,800,000 Ficoplus Co., Ltd. 8,560,000 34,240,000 - Labour Cost 12,840,000 Fenacon Co., Ltd. 2,568,000 10,272,000 5 External Façade & Soft Works 32,100,000 32,100,000 6 Operating, Consultant & Design Fee 10,700,000 7,466,384 3,098,109 4,368,275 - Interior Design Fee 1,926,000 Leo International Design Group 963,000 963,000 - Architectural Design Fee 2,140,000 Interkon Akitek Co., Ltd. 856,000 1,284,000 - Lighting Design Consultant Service 214,000 C&P Lighting Co., Ltd. 42,800 171,200 - Soil Investigation 50,000 Mr. Jongsawadi Maneesinth 50,000 - - Soil Investigation 557,684 STS Engineering Consultant Ltd. 557,684 - - Slab Load Test 224,700 Finese Soil Testing Co., Ltd. 224,700 - - Project Consultant 2,354,000 Northcorft Consultant Ltd. 403,925 1,950,075 7 Operating Supplies & Equipment 26,750,000 26,750,000 8 Preopening Expenses 5,350,000 5,350,000 Total Construction Cost 214,000,000 202,411,375 22,965,306 67,096,069
การแปล กรุณารอสักครู่..

RESIDENCE METROPOLE Service Apartment (หน่วยบาท)
FENIX ทองหล่อ Projetion Suplliers จริงการชำระเงินคงเหลือ1 โครงสร้างธิ 10,700,000 8,764,991 5,101,197 3,663,794 - 3,531,000 Demolation ทำงาน Fenacon จำกัด 3,531,000 - - โครงสร้างธิ 5,233,991 Fenacon จำกัด 1,570,197 3,663,794 2 สถาปัตยกรรมธิ 10,700,000 18,190,000 3,638,000 14,552,000 - 18,190,000 Architectual ธิ Fenacon จำกัด 3,638,000 14,552,000 3 ตกแต่งภายในธิ 48,150,000 48,150,000 4 M & E ทำงาน 69550000 55640000 11128000 44512000 - ต้นทุนวัสดุ 42,800,000 Ficoplus จำกัด 8,560,000 34,240,000 แรงงาน - ต้นทุน 12,840,000 Fenacon จำกัด 2,568,000 10,272,000 5 ภายนอกFaçadeและซอฟท์ธิ 32,100,000 32,100,000 6 การดำเนินงานที่ปรึกษาและการออกแบบค่าธรรมเนียม 10,700,000 7,466,384 3,098,109 4,368,275 - ออกแบบตกแต่งภายในค่าธรรมเนียม 1,926,000 สิงห์ออกแบบนานาชาติกลุ่ม 963,000 963,000 - ออกแบบสถาปัตยกรรมค่าธรรมเนียม 2,140,000 Interkon Akitek จำกัด 856,000 1,284,000 - ผลิตภัณฑ์ส่องสว่างที่ปรึกษาออกแบบ บริการ 214,000 C & P Lighting จำกัด 42,800 171,200 - สำรวจดิน 50,000 นาย Jongsawadi Maneesinth 50,000 - - สำรวจดิน 557,684 STS วิศวกรรมที่ปรึกษา จำกัด 557,684 - - Slab โหลดทดสอบ 224,700 Finese ดินทดสอบ จำกัด 224,700 - - ที่ปรึกษาโครงการ 2,354,000 Northcorft ที่ปรึกษา จำกัด 403,925 1,950,075 7 วัสดุและอุปกรณ์ในการใช้งาน 26,750,000 26,750,000 8 Preopening ค่าใช้จ่าย 5,350,000 5,350,000 ก่อสร้างค่าใช้จ่ายทั้งหมด 214,000,000 202,411,375 22,965,306 67,096,069
การแปล กรุณารอสักครู่..