One credit
1
Opportunities have been identified, and appropriate measures investigated and implemented, to optimise the more efficient use of materials in building design, procurement, construction, maintenance and end of life.
2
The above is carried out by the design or construction team in consultation with the relevant parties (see
CN3
) at each of the following project work stages:
2.a
Preparation and Brief
2.b
Concept Design
2.c
Developed Design
2.d
Technical Design
2.e
Construction.