The first set, hereafter called variable slump (VS), was used
to test the properties of concrete having 0%, 5%, 10%, 15%, 20%, and 30% volume
replacement of sand with shredded rubber.
The first set, hereafter called variable slump (VS), was usedto test the properties of concrete having 0%, 5%, 10%, 15%, 20%, and 30% volumereplacement of sand with shredded rubber.
การแปล กรุณารอสักครู่..
