1. Working Demolition of Equipment
1.1 Demolition pole 9 meter
1.2 Demolition pole 12 meter
1.3 Demolition the equipment all kinds off
2. installation of a new transformer.
Install 12-meter pillars
Add call THW-A 1 * 50 Sq.mm system 22 kv.
System Ground
Pour casting mast
The components in the assembly
3. The fee for the electrical contact.