we will use the standard test used in
industry called the ‘volatility of the tracking error’ defined by
the expected variance of the difference between the returns
of the passive portfolio and those of the benchmark. The
standard deviation of this variance can be written as Note that the tracking error defined by equation (1) focusses
on minimizing the variance/standard deviation in the return
differences.