• Ground floor design – see separate email from myself…
• Need co-ordination with engineering team to understand engineering requirements
• Louver design has not changed (except louver blades, but no spacing…water drainage also does not work 100%) need better frame design…
• Access doors at C/W – No revised concepts due to load / deflection problems….
• No water drainage pipes through C/W at L11 are designed / detailed….
• No info of sprinkler pipe locations….
• Bad details, (some incorrect also, some not yet changed..some fin details are no good or do not work…) etc,
• No note on dwgs regarding ‘DISS-ASSEMBLY” for green star (same as 085)
• Thermal note/s not yet removed from all dwgs….(all to be removed now we are no longer at concept phase…)
• No marked up elevation dwgs showing what is still to be designed / detailed with schedule of completion….
ADDITIONAL NOTE/S
• Please confirm if you now have calculation comments
• Confirm re-submission schedule…
• I will review further, however please proceed with what you can,,,any concepts send to me for review first…