The purposes of this paper was to study, and evaluate different
suggested modifications in infrastructure, rolling stocks,
and control system in a railway network operation, namely
ABO-KIR railway line in Alexandria City. Railway Simulation
Computer Program RailSYS3.0 has been utilized for this
purpose.