Construction Specifications and Procedures
Use approved for construction only, Construction Quality Surveillance
Inspection and Test Plans (ITP’s) and Field Installation Checklist (FIC’s)
Nonconforming Work and Processes
Non-conforming materials shall be identified and documented to ensure that they are not inadvertently used or installed.
The rejected materials is recorded as “does not comply” or “DNC” in checklist
if the rectification of the non-conformance is at all complex, is not immediately possible or approval of the disposition to repair or rework, a Non-conformance Report (NCR) is raised.