Halliburton opened a 500,000 sq ft (46,000 m2) manufacturing center in Duncan, Oklahoma, in 1964. The company began to experiment with new technologies to help their services – for example, beginning in 1965 a pilot operation of a computer network system – the first such installation in the oilfield services industry.In 1966, workers broke ground for a new wing at the Research Center in Duncan that tripled the available space for the Chemical Research and Design Department.
In 1968, an automated mixing system for drilling mud was developed by Halliburton, primarily for use offshore.Gearhart Industries (acquired by Halliburton Energy Services in 1989) introduced the first digital computer logging system in 1974
Halliburton opened a 500,000 sq ft (46,000 m2) manufacturing center in Duncan, Oklahoma, in 1964. The company began to experiment with new technologies to help their services – for example, beginning in 1965 a pilot operation of a computer network system – the first such installation in the oilfield services industry.In 1966, workers broke ground for a new wing at the Research Center in Duncan that tripled the available space for the Chemical Research and Design Department.
In 1968, an automated mixing system for drilling mud was developed by Halliburton, primarily for use offshore.Gearhart Industries (acquired by Halliburton Energy Services in 1989) introduced the first digital computer logging system in 1974
การแปล กรุณารอสักครู่..
