We have already prepared all activities such as design manual, design drawing, some installation equipment etc. especially the design work. Refer to the preliminary design which submitted to GBSC on 23 August 2013. It shall both cost and time impact, if we have to change our Track Support Type. The discrepancy of Track Support Type will effectively to the prepared drawing has to modify edit from the starting of Preliminary step