Though the construction with well slope stability design has been carried out, there are some monitoring programs that shall be carried out during this period for all project structure.
Set up weekly and monthly slope stability inspection upon the conditions of the concerned area, Monitor groundwater level and pore pressure by installation of peizometer wells at concerned structures, Set-up water quality and sedimentation monitoring program for surface water and shallow groundwater wells around the project area.