Inspect heater stream nozzle fianges and valves for wire cutting.
Report which nozzle have thermal pressure relief bosses and valves.
iI internal elbow-donw fill line nozzles, inspect the wear plate on the tank bottom.
On elbow-up fill lines in floating roof tanks, Check that opening is directed against underside of roof, not against vapor space. Inspect impact are forerosion.