3.2
4) To prepare interface so that it can remotely start and stop.
(4) Utility
1) Compressed Air: 0.59 - 0.8 MPa
Temperature: Max. 35 °C Design criteria
(1) Noise level of the equipment shall be less than 85dBA (1m apart from the machine).
3.3 Notice
1) Each machine to be attached with English nameplate and tag no. which will be decided by
4. 4.1
SPCO.
2) Submit drawings at the time of quotation, the internal structure of the electromagnet,
dimensions, drawings and the, material used.
3) All the flanges of the pipes shall be made based on ANSI#150, includes companion flange,
gasket, bolts and nuts. .If ANSI flange is not applicable then process the companion flange
hole size to the size of ANSI.
4) If there is an unclear point concerning details, discuss and receive instructions from SPCO.
Specification change by lack of recognition is the responsibility of vendor. Vendor shall take
the responsibility by manufacturing, supply and replacement, etc.
5) Technical matters of this specification shall not be disclosed to any third party without SPCO
prior consent.
6) When vendor gets the enquiry about this order and similar to this order from end user or the
third party, etc. SPCO gets the right of contact point.
In this case, vendor should inform SPCO when vendor gets the enquiry. Then SPCO decides whether to apply this provision or not.
3.24) To prepare interface so that it can remotely start and stop.(4) Utility1) Compressed Air: 0.59 - 0.8 MPaTemperature: Max. 35 °C Design criteria(1) Noise level of the equipment shall be less than 85dBA (1m apart from the machine).3.3 Notice1) Each machine to be attached with English nameplate and tag no. which will be decided by4. 4.1SPCO.2) Submit drawings at the time of quotation, the internal structure of the electromagnet,dimensions, drawings and the, material used.3) All the flanges of the pipes shall be made based on ANSI#150, includes companion flange,gasket, bolts and nuts. .If ANSI flange is not applicable then process the companion flangehole size to the size of ANSI.4) If there is an unclear point concerning details, discuss and receive instructions from SPCO.Specification change by lack of recognition is the responsibility of vendor. Vendor shall takethe responsibility by manufacturing, supply and replacement, etc.5) Technical matters of this specification shall not be disclosed to any third party without SPCOprior consent.6) When vendor gets the enquiry about this order and similar to this order from end user or thethird party, etc. SPCO gets the right of contact point.In this case, vendor should inform SPCO when vendor gets the enquiry. Then SPCO decides whether to apply this provision or not.