1. Found that emptying pipe was replaced before this lot number production. Sufficient unqualified products were emptied and every data passed our tests before started to pack.
2. Maintenance worker used old pipe to replace although cleaned it before installation. But it was a 3-5 meter pipe and middle inside part may not be totally or the intermediate product sticking onto pipe was too long clean.