Pipes are checked visually and hammer-tested, with some also being pressure-tested.
The surveyor will select which pipes are to be pressure-tested. Pipes carrying superheated
steam, the fire main and those that are part of a fixed fire extinguishing system should always
be tested. Some pipes maybe selected for dismantling and internal inspection.