Key-Plan Sfar Present.
PC Wall.
Install Wire Mesh Roofing Work.
Dock Leverler Work.
Erection Truss.
Ground Beam Work Oil Tank Yard.
QC Document and Steel Structure.
Set a Spriwker, Under Ground Toilet2.
Sleeve Pipe for Pump & Booster Pump.
U/G Pipe Toilet2(Staff) Office Area.Dwg
Safety Inspection.
Safety Patrol and Document.
Safety Patrol and Document.
Steel Bar & Formwork, Water Tank Utility Bldg.
Gutter Work. & Document Work.
Gutter Work. & Document Work.
Lean Concrete & PC Wall.
Shop Drw. Detail Support.
Document Work : Shop Drawing Document Work.
Document Work : PO.Spot.