I try to summarize the situation:
1) Frame 3: we received the comments minor,
2) Switch bridge beams, we forgot the walkway inserts on the shop drawings.
3) Frame 20: comments some minor, some not on the PT . Phipat cou you please send me the PT drawings of frame 20 for me to answer the comments. Frame 20 is not standard.
4) Frame 13, minor comment on one sheet, Phipat please resend directly to Oussame
5) Complete last typical frame (16)
6) Start long span ASAP, I will do the coordination with methods for lifting.
(Khun Phipat, can you resend the link to the drawings).
Erwan