For this study, we constructed a pilot system of integrated waste
stabilization ponds (WSP) with water hyacinth ponds (WHP) in a
municipal wastewater treatment plant as shown in Fig. 1. This
treatment plant uses the conventional activated sludge process, and
its design treatment capacity is 30,000 m3/d. The operational
parameters of the WSP and WHP are summarized in Table 1.