• Conducting inspections of inside roof fabric after completion of the forming and water jetting process.
• Checking for glue stains errors.
• Performing 80% inspection of parts at minimum of 1,000 pieces/day.
• Sorting out rejected parts and grouping each error into type for further rework.
• Conducting inspection of various other roof fabric parts on completion of the forming and water jetting process.
• Performing 100% inspection of parts (at minimum 1,000 pieces/day).
• Using various inspection instruments including thickness gauges and table gauges.