are used to analyse the current state condition of the autoclave process using the
data obtained. From the MOST analysis, the total operation time per lot and man machine optimization ratio is
obtained. In the existing operation floor, the work forces are shared between Autoclave 5 and Autoclave 6 machine
where 2 operators are handling 2 machines. The initial operation time per lot is 13.83 hours and the MMO ratio is 1
operator to 1.4 autoclave machines.