According the “Filament” problem of GTS3, I just summary the result of 2 Eng. lot that we received from Sii, then we did inspect, the result we could find a lot of “Filament” problem, may this summary result is helpful for you inform to Sii.
I’m concerned with our process capability of inspection if we still 100% inspection product before ship to Sii.