The consulting engineer recommended leaving at least 8 feet of soil above the base of the caisson at all times. Concrete caisson walls were built 6 feet thick, providing sufficient weight to counteract the drag forces. In addition, a water jet system built into the caisson walls lubricated the outside of the caisson during sinking.