The original Tacoma Narrows Bridge was solidly built, with girders of carbon steel anchored in huge blocks of concrete. Preceding designs typically had open lattice beam trusses underneath the roadbed. This bridge was the first of its type to employ plate girders (pairs of deep I-beams) to support the roadbed. With the earlier designs any wind would simply pass through the truss, but in the new design the wind would be diverted above and below the structure. Shortly after construction finished at the end of June (opened to traffic on July 1, 1940), it was discovered that the bridge would sway and buckle dangerously in relatively mild windy conditions that are common for the area, and worse during severe winds. This vibration was transverse, one-half of the central span rising while the other lowered. Drivers would see cars approaching from the other direction rise and fall, riding the violent energy wave through the bridge. However, at that time the mass of the bridge was considered to be sufficient to keep it structurally sound.