Sufficient capacity must be maintained to produce the planned Volume of goods and to meet the peak loads during the planning period.
The production capacity of individual departments should be
assessed and coordinated in the production budget to avoid
production bottlenecks and idle capacity
Top management should know about the maximum capacity,
practical capacity and breakeven capacity