Assume that the funding will occur evenly over the 5-year period from 2010 through 2014 at $2.2 billion per year. The disbenefits are estimated to be $100,000 for each displaced person and $1billion for wildlife destruction. Assume that the disbenefits will occur evenly through the 5-year construction period and anticipated benefits will begin at the end of 2015 and continue indefinitely. Use an interest rate of 8% per year to determine what the equivalent annual benefits must be to ensure a B/C ratio of at least 1.0