- Establish and implement the inspection and preventive maintenance program for drainage system.
- Install sedimentation and/or retention ponds to received drainage water and runoff water from construction site and work camps before being discharged off-site to a natural water bodies
- Design the size of the sedimentation and/or retention pond based on the estimated volume of wastewater to ensure that its capacity is sufficient and for sedimentation and retention process