The ideal situation would be to model anticipated field lateral-loading conditions. Thus, for example, if the
pile is subjected to cyclic lateral loading for in-service conditions, then a cyclic loading sequence
should be used. The pile is usually loaded to a value that is at least twice the lateral design load