Workload involved in each proposed alternative was assumed as the sum of handling effort, work repetitiveness and work content, as evaluated by two ergonomists, on a continuous scale varying from 1 (minimum cost, as in the case of Alternative 1) to 3 (maximum cost assumed for the functional model).