27.1 The awarded bidder is to be entirely responsible for the design, construction, capacity and the efficient performance of the whole of the locomotives under contract notwithstanding any approval which may have been given to the detailed drawings prepared by the Contractor or to the manufacture of materials or parts employed by the Contractor, or to tests carried out by the SRT Inspecting Engineer (ร) or by the Contractor