We have a query on invoice DMK-201606024.
1. Please advise how the THB7,000 is calculated for tractor towing + tow bar.
2. Understand that the extra towing was required because the marshaller showed stop signal before aircraft stop at the correct stop bar line. Is it possible to waive this charge as marshaller belongs to BAGS had made a mistake.
3. Why is there an additional manpower charge for TZ302/ 30 Jun?
4. Please provide the rate for the manpower charge.
Hope to hear from you again. Thank you.