5. Implementation timing
The actual implementation timing shall be set up by a Development Schedule Plan (SASG: K10-05A).
(1) At the time of designing a newly designed product or design-modified product: the DRBFM shall be
implemented and finalized before design arrangement for manufacturing.
(2) In case a DRBFM is implemented on customer request: the timing shall satisfy the customer request.
(3) In case DRBFM and design change point control are implemented at the same time, the completion
timing shall be in accordance with chapter 9 "Completion timing of Design Change Notice" of SASG:
K16-01A "Design Change Notice (DCN)".