The 4# tailing pond (14.3 km2 area) with a design capacity of 8.35×109 m3, is still currently in use, where approximately 1×105 t of flotation tailings are deposited per day [1]. Therefore,the 4 # tailing reservoir has become the biggest one in Asia.