- avoid pinch point.
- House keeping.
- Ensure that all energized and isolate already by using multimeter before start work / Lead test with insulation.
- Wear electric gloves.
- Provide use insulation of tools and all hand tools should be in good condition.
- Review single diagram/confirm hardwiring is updated same as drawing.