To whom it may concern
Since the 30% of capital raise up have been completed, we would like to start working on civil work to be able to catch up with the schedule. However, there are some vague areas in public utilities that need to be clarified about the specification so we can compare the prices with local suppliers. (Appx EPC contract 4.2)
1. Please specify the tool list in testing equipment beside the Liquid Density Standard which FKT already sent you photo dd. 19/8/2014.
2. Please provide details and specifications of following details:-
2.1 Transformers. We previously had (800 KVA, 500KVAx2 ,400KVA), are these enough capacity?
2.2.River Water Supply and Purification
2.3 Lightning Protection. ( what height it should be)
2.4 Soften Water System For Stream
2.5 Cooling Tower Service
2.6 Fire protection system.