Scheduling effectiveness (Figure 7.1-13) is tracked for Collin
and its two EMS partners. Ideal capacity fill is between 85%
and 90%. This ensures sufficient unscheduled time to perform
preventive maintenance and contingency capacity. Collin is
currently considering the timing for the addition of a limited
third production shift. The drop in capacity at Thai EMS is
related to the flooding in 2011.