As general route buyer will use an automatic generate an Order Header both TR and PR parts via RFQ system in AS400. (not manual create an order schedule).
Then this is a special case, If you need TR parts via F4, a manual order header and schedules creation are required by manual for support a new one F4 order placing with Srithai.
(part payment between F4 with Srithai and to allow TR parts can book-in to F4) and get these TR parts at F4 factory.
When book-out these TR parts via stock transfer system, Logistic will use this DES order (DES033992) for sale these TR parts from F4 mould shop to Design.
However, the DHL’s Design cost is required for meet due:24/08/2015.
Are you happy with above?