The Final Inspection. Since that 28 January 2016 of additional detour line Tower for 115kV Lot No. 1DBENT001LB01 ,1DBENT001LC01 and 1DBENT001AT02 with Committee EGAT inspect to product had found defect of the Mark No. 233 found repair with touch up don't used cold galvanizing to thread of bolt ,as part of the Mark No. 2WSD 233