The capacity of most resources is measured in terms of time availability, but the new ABC approach can also recognize resources whose capacity is measured in other units. For example, the capacity of a warehouse or vehicle would be measured by space provided, while memory storage would be measured by megabytes supplied. In these situations, the manager would calculate the resource cost per unit based on the appropriate capacity measure, such as cost per cubic meter or cost per megabyte.