Technical Codes and Standards listed herein and in the Project Specifications, and the Design Criteria shall be used in the design, engineering, construction and maintenance.
The latest edition of Codes and Standards published shall apply.
The Work shall be executed in accordance with these Codes and Standards, the Project Specifications and Process Duty Specifications and conformance to applicable Thai Governmental authority codes and regulations.
American (U.S.) codes and standards shall be used as a basis for the Work, if not specifically stated otherwise.
In case of conflict between codes and standards and these Process Design Criteria or ordinances of local jurisdictions, the document with more stringent requirements shall govern.
In regard to items not covered by codes other manufacturing and safety standards developed or used in the petroleum and petrochemical industry may be applied.
If the CONTRACTOR has a justified reason to deviate from the Codes and Standards or the Process Design Criteria the CONTRACTOR shall ask JBE for acceptance.
Technical Codes and Standards listed herein and in the Project Specifications, and the Design Criteria shall be used in the design, engineering, construction and maintenance.
The latest edition of Codes and Standards published shall apply.
The Work shall be executed in accordance with these Codes and Standards, the Project Specifications and Process Duty Specifications and conformance to applicable Thai Governmental authority codes and regulations.
American (U.S.) codes and standards shall be used as a basis for the Work, if not specifically stated otherwise.
In case of conflict between codes and standards and these Process Design Criteria or ordinances of local jurisdictions, the document with more stringent requirements shall govern.
In regard to items not covered by codes other manufacturing and safety standards developed or used in the petroleum and petrochemical industry may be applied.
If the CONTRACTOR has a justified reason to deviate from the Codes and Standards or the Process Design Criteria the CONTRACTOR shall ask JBE for acceptance.
การแปล กรุณารอสักครู่..