The development will provide:
• Around 800 new dwellings.
• An extra care facility.
• Substantial areas of Public Open
Space providing recreation areas,
formal play areas and ecological
networks that are accessible to all.
• Sustainable transport links.
• Integration of foot and cycle paths
(existing and proposed) with green space.
• Sustainable Urban Drainage systems
to manage surface water run off.
The primary vehicular access to the site
will be from two points on Pulley Lane.
The scheme has been designed to allow bus
access into the site. This will be achieved
by re-opening and improving the junction
of Newland Road with Primsland Way for
a pedestrian/cycle and bus only link.