Dear khun Joe,
Canopy
1 No drawing of steel frame support stainless gutter
2 No drawing of steel frame support cellocrete siding
3 Round column ,cellocrete cannot be round shape may can use aluminium composit
4 Canopy1 no lighting
5 Roof drain pipe cannot follow drawing because slab and pond already done
6 Canopy 2 no support of tempered glass wall and steel frame that hang under roof
Architect
1 Food Center FL3 no spec floor finish in ID and Arch Dwg
2 Food Center FL2 now finished 90%. Do have anything change?
3 Chain link fence of gas station. There is not in dwg. Last time approved in VO.
4 Service Ladder for outside CDU. There is not in dwg. Last time approved in VO.
5 Service Ladder for Roof Water Tank. There is not in dwg. Last time approved in VO.
6 Ramp RP-1 no spec floor finish in ID and Arch Dwg
7 Corridor 1A-4' / I-K no spec ceiling in ID and Arch Dwg
8 Detail of corridor railing
9 Discuss insulation between wall
10 Ceramic tile on corridor, some area are finished. Will it change ?
M&E