the energy requirements
for original versus optimized cases were estimated
as shown in Table 7. It can be seen that before optimization, the
total heating and cooling duty required for this process was
estimated to be 94.1 MW. After optimizing the heat exchanger
network, the total energy requirement was decreased to
39.7MWfor which the gross energy savings was 57.8%.