1.Pave glue 0.2kg/sqm. on the base.
2.Mix with black granules of size24mm. and glue into the blender, The rest is 2(black granules):1(glue), sequence to pour is:
granules to glue to granules, stir for three minutes.
3.Paving EPDM Granules'Layer:
Draw patterns on the bottom layer, and stir with EPDM granules and glue rate is 6(EPDM granules):1(glue) then pave them on surface.