The slurry was allowed to occupy three quarter of the digester space leaving a clear height of about 0.0625 m as space for the gas production. Before feeding the reactors, the flexible hose connecting the gas outlet from the reactor to the gas holder was disconnected, such that the gas outlets from the reactors were left open