A proposed embankment fill requires 8000 m3 of compacted soil. The void ratio of
the compacted fill is specified as 0.7. Four borrow pits are available as described in
the following table, which lists the respective void ratios of the soil and the cost
per cubic meter for moving the soil to the proposed construction site. Make the